Search
Birney 135 Restoration
- COLORADO SPRINGS & INTERURBAN RAILWAY
- Jun 24, 2016
- 1 min read

Remaining Birney work includes electrical work and completing the brake system. Electrical work includes restoration of the K10 series-shunt controllers, resistor grids, and circuit breakers. For the brakes a second hand brake is being fabricated to meet requirements for operation. The brake system requires some other work as well. Completion costs are estimated at less than $10,000.
Recent Posts
See All- Former SEPTA Clark B2 PCC trucks - Replica U.S. Type 6 Trolley Base Based on the U.S. patent with the following improvements: Square...